Single-Family Permit Value
On this page
Overview#
Single-family permit value is the average construction value, per house, of the single-family homes a place is approving. It shows whether new houses there are entry-level or high-end product. Because apartments are left out, a shift toward apartment building does not pull the figure down.
Definition#
The average construction value per house of the one-unit buildings a place authorizes: their combined permit valuation divided by their units. One-unit buildings include detached houses, row houses and townhouses, as long as each attached unit has its own ground-to-roof wall and utilities. The valuation is the estimated value of the building shown on the permit, or the permit official's estimate when none is listed (Building Permits Survey definitions).
Values are in the dollars of the year the permit was issued, not adjusted for inflation.
How to use it#
The value tells you what tier of new house a place is building, from starter homes to custom ones. Compare it with nearby places and the metro.
High and low values
- High value: often large or custom homes in wealthy suburbs, resort areas or places with high building costs. New homes there usually sell to high-income buyers.
- Low value: often starter homes, townhouses or places with low building costs. New homes can be within reach of first-time buyers.
Scenarios
- A housing downturn: builders often cut back on high-end homes first, which can pull values down.
- Rising mortgage rates: builders often shift toward smaller, cheaper homes to keep payments within reach, which can pull values down.
- A fast-growing suburb: values can show whether new growth is aimed at first-time buyers or at move-up buyers.
Use cases
- Spotting a market moving up: a value rising faster than nearby places can point to builders chasing higher-income buyers.
- Judging new-home competition: showing whether a planned project would compete with similar homes or fill a missing price tier.
- Comparing new homes with existing ones: setting the value beside local home values shows whether new construction is aimed above or below the current stock.
Source: Building Permits Survey#
Census Building Permits Survey, published by the U.S. Census Bureau.
Metrics
Average single-family permit value per unit
Declared valuation for one-unit structures divided by the units authorized in them. Because a small place may authorize only a handful of houses in a year, the figure is read across the three most recent survey years pooled together rather than a single year.
Average single-family permit value per unit, change
5-yr and 10-yr change, in percent, between the latest three-year pool and the three-year pool ending five or ten years earlier. For example, a move from $300,000 to $360,000 per unit is +20%. Both three-year spans must be complete. The change is in nominal dollars, so it includes construction cost inflation. There is no 1-yr change, because two adjacent three-year pools share two of their three years.
Considerations
- Declared value is not market value. The Bureau says permit values often differ from the true cost of building. Use it to compare places, not as a price.
- Permit offices value homes differently. Some record a contractor's estimate and others a standard fee figure, and missing values are filled with a regional average, so neighboring places can differ for administrative reasons.
- No single-family permits, no value. Places with no one-unit permits in the window carry no value rather than a low one.
- A townhouse and a large house count alike. Both are one-unit buildings, so places building different kinds of homes differ in value for reasons unrelated to quality.
- Tracts borrow a place or county figure. Tracts show the figure of the permit-issuing place they sit in, or their county's otherwise, marked as an estimate. There are no ZIP code figures.
For limitations that affect all Building Permits Survey metrics, see Building Permits Survey considerations.
For the complete methodology and the full list of limitations, see the U.S. Census Bureau’s Building Permits Survey Methodology.
References#
- 1Building Permits Survey definitionshttps://www.census.gov/construction/bps/definitions.html
- 2Building Permits Survey Methodologyhttps://www.census.gov/construction/bps/methodology.html
Birdseye summarizes data from public and commercial sources. Each source’s publisher is the authority on its data and methods. See our Terms of Service.